Jaromir Sochor

Ing.

retired

EGI, ČEZ – JE Dukovany, JE Temelín, Škoda Praha a.s., JE Temelín, ČEZ Energoservis s.r.o., Škoda Praha Invest, now retired

I have been working in energy for the whole career. A short time in the construction of IBZKG turbines, since 1978 during the construction of the Dukovany NPP as technical supervision of the investor in control and coordination of machine assemblies of the primary circuit of the NPP, later as head of the control and coordination department of machine assemblies of the primary circuit of Dukovany NPP For units 1 - 3 preparation and handover.
At NPP Temelín, continuation to the same position as the head of the department, later as the head of the department of coordination and control of machine assemblies on both units.
After the transition to Škoda Praha a.s. I first worked in the sales department, where, among other things, I provided the supply of TMDS from Westinghouse, including participation in final tests at the manufacturer before handing over to the Czech Republic for installation at Temelín NPP and as an administrator of strength, durability and seismic resistance certificates for Temelín NPP.
In the implementation department, I worked as the head of the department of all-professional coordination of assembly work on UNIT 2 until it was handed over for commissioning. At the same time, I was entrusted with the management of Škoda Praha at the Temelín NPP by coordinating work on the completion of the fresh fuel storage facility before the fresh fuel was delivered.
After finishing the work of the implementation section at the Temelín NPP, I joined ČEZ Energoservis.
At the Ledvice power plant, I worked as a project manager providing complete site preparation and preparation of construction organization for the 660MW unit, such as demolition work (K1 Unit), relocation of underground networks, modifications to the existing office building and construction of a new administration buildings, ensuring the preparation and construction of construction site equipment from design to implementation work. After finishing the previous work and after handing over the construction readiness of the engine room, I worked as a representative of the turbine building on the construction site as a coordinator of assembly work till handing over for commissioning.


zpět na seznam jmen